- About MKB Hem
- Specifications
- Floor Plan
- Ground Floor Plan
- Key Plan
MKH Hem, the stylish building situated at Pon Nagar, Trichy has unique layout of 8 exclusive 3 BHK flats with area specifications of 1368, 1314 sq.ft housed in +4 floor structure makes living luxurious and comfortable.Each flat boasts of a covered car park, individual water availability and power supply which makes the owner independent and great neighborhood.The spacious bedrooms and classic floors with finish fitting reaches the level of perfection. A touch of royalty is conceptualized in every angle of project. The perfect blend of functionality helps us to strike the balance between aesthetics and convenience in each flat to excellence. We are flexible to requirements of our customerin interior designs and floorings. This project is expected to complete on 30.09.2013.
Structure RCC Frammed structure Flooring Living, Dining and Bed Room Flooring with 2’x2′ vertified tilles with skirting kitchen, Toilet & Balcony Anti skid ceramic tiles Main Door First quality country wood frames with moulded doors with enamel paint Other Door First quality country wood frames with moulded panelled doors with enamel paint Windows UPVC Window Kitchen Modular kitchen with top and bottom cabinests granite working counter with stainless steel sink. Premium decorative lights & Quality CP fittings. Toilet Quality sanitary wares with glazed tiles up to 7’0 height. EWC for Attached Toilet & IWC for Common Toilet. Painting Interior Smooth finish full putty with emulsion paint Exterior Outer wall with premium quality anti fungal and anti fading paint Water Supply One common Borewell and sump of Adequate size with two seperate over head tanks, one for corporation water and other for Borewell water. EB Supply Three Phase EB connection for each flats Intercom & Security Intercom connection between flat to flat and security and cctv Camera with 24×7 Recording Backup. Lift In addition ot Staircasa a Automation Lift with capacity of 6 Passenger with generator backup Generator Backup Generator for lift and common amenities Car Parking Covered car parking at Extra Cost Mode of Payment
On Booking 10% Before Registration of Land ( With in 30days from the date of booking) 30% After completion of Respective floor concreting 25% After completion of Brick Works 15% After completion of Plastering 15% After completion of Flooring 5%